Inauguration of an industrial plant for a packaging company

0

ELGIN — Premier Design + Build Group has opened a large new industrial build for an end-user customer who specializes in the design and manufacture of packaging solutions. The 438,750 square foot facility will be the company’s newest Midwest branch, which has offices across the United States. The new facility will be located at 2601 Mason Road in Elgin.

The structure will feature precast concrete walls, a clear height of 36 feet, 30 dock positions and three entrance doors. Indoor spaces will include large processing areas, community and open work spaces, a press room, seven offices and conference rooms. Premier will install an outdoor paved lot on the 37.7-acre site to accommodate 300 vehicles and 32 trailers.

The target completion date for the project is February 2023. Prime Minister Mark Riedy is the project manager, along with project superintendent Scott Lebak, and Joseph Ahrens, senior vice president, market leader.

The Premier team works with Ware Malcomb for architectural design services, Manhard Consulting for civil engineering services and LJB Engineers for structural engineering.

Share.

About Author

Comments are closed.